Stellar Work Construction

Tiles Installation

Our Tiles Installation Services

Planning and Preparation

  • Assess the subfloor condition
  • Measure and calculate tile layout for optimal aesthetics
  • Select appropriate materials and tools

Surface Preparation

  • Clean and level the subfloor
  • Install backer board if necessary
  • Apply waterproofing membrane in wet areas

Layout and Dry Fitting

  • Snap chalk lines to mark the center and quadrants of the room
  • Perform a dry layout to ensure proper tile placement and minimize cuts

Adhesive Application

  • Mix thinset mortar to the proper consistency
  • Apply mortar using a notched trowel appropriate for the tile size

Tile Setting

  • Begin laying tiles from the room’s center, following chalk lines
  • Use spacers to ensure even grout lines
  • Cut tiles as needed using a wet saw or tile cutter

Leveling and Adjusting

  • Use a level and straight edge to ensure tiles are even
  • Make adjustments before mortar sets

Grouting

  • Allow mortar to cure for 24-48 hours
  • Mix and apply grout, filling all joints completely
  • Clean excess grout from tile surfaces

Finishing Touches

  • Seal grout lines (if required)
  • Install trim pieces and thresholds
  • Clean and polish tile surfaces

Our projects Gallery

How can we help?

For tailored solutions, please provide essential project details to help us understand your vision and requirements

We offer complimentary inspections and estimates